Stay connected
Enter your email to receive updates on The ROCk: progress, events, and ways to get involved delivered straight to your inbox.


This report covers the April 9 community forum through the people who came to oppose theROCk. Business owners, a resident and a nearby property owner raise concerns about the effect on local trade, about safety, and about whether a 1.1-acre site on a single-lane dirt road can support a 125-bed facility.
Board Chair Kent Grubbs responds in the piece. His argument is that Pete’s Place was never designed for what it ended up doing, and that theROCk is a different proposition: purpose-built, roughly $16 million to construct and $2.5 to $3 million a year to run, with a paved road and streetlights part of the plan.
Note: this report is written through the concerns raised by opponents at the forum. The same evening is covered from other angles by KRQE News 13 and the Santa Fe Reporter, both in this collection.
Santa Fe New Mexican, April 10, 2026. By Lily Alexander. A subscription may be required to read the full article.